Design
Space, heat dissipation and accessibility
The layout, components and cable routes are coordinated with the machine and the conditions at the installation site.

Control and switchgear cabinets for new and existing plants. From assembly and wiring through to testing and commissioning.
Send a no-obligation inquiry and discuss technical details directly

Space, heat dissipation and accessibility
The layout, components and cable routes are coordinated with the machine and the conditions at the installation site.

Mounting plate, DIN rails and components
Components, terminals and operating elements are arranged clearly and with future maintenance in mind.

Identification, terminals and cable routing
Power and control circuits are wired to plan, clearly identified and prepared for efficient commissioning.

Test report, connection and commissioning
The cabinet is tested before delivery and, on request, installed and commissioned directly at the plant.
Every control cabinet is designed for its machine, control system and installation site.
We manufacture control and switchgear cabinets for new plants, extensions and retrofit projects. Existing circuit diagrams or an EPLAN design prepared with us provide the basis. The layout, components, cable routes, heat dissipation and accessibility are agreed before production begins. For conversions, we account for the available installation space and existing interfaces. Assembly and wiring follow the approved project documents. Testing, documentation and, if required, installation at the plant complete the work.
A clear layout simplifies commissioning, maintenance and troubleshooting.
Mounting plates, DIN rails, cable ducts, terminals and operating elements are arranged according to the design. Cables and equipment are clearly identified. Space reserves, cooling and access to maintenance-relevant components are considered in line with the project requirements.
Mounting plate · Components · Terminals · Wire identification
The control cabinet is tested before delivery and the results are documented.
The tested cabinet is handed over with the corresponding documents. On request, we install and connect it at the machine and carry out functional testing and commissioning together with the control and plant systems.
Test report · As-built documents · Installation · Functional testing
FAQ
Current circuit diagrams, layout drawings, bills of materials and information about the machine and installation site are helpful. The required enclosure dimensions, environmental conditions and interfaces should also be known.
If the design is incomplete, we first clarify which engineering work is still required before manufacturing can begin.
Yes. We manufacture from approved project documents and check whether the information required for assembly, wiring and testing is complete.
Necessary changes or component alternatives are agreed before they are implemented and are reflected in the final documentation.
The relevant Austrian and European requirements and the technical specifications of the project provide the basis. Low-voltage switchgear assemblies are generally built to ÖVE/ÖNORM EN 61439.
The exact design and test scope is defined before manufacturing begins, as it depends on the cabinet and its intended use.
The control cabinet is tested before delivery in accordance with the agreed scope. The tests performed and their results are recorded in a test report.
The cabinet is handed over with the applicable drawing revision and the agreed technical documents.
Yes. We replace obsolete components, extend existing cabinets and build replacement cabinets as part of plant modernisation projects.
On request, we handle installation, connection, functional testing and commissioning directly at the machine or plant.
Programming, electrical planning, control cabinet building or testing: tell us about your project and we will get back to you.