PLC and software
PLC control system modernisation
We assess the existing PLC, switch to your preferred control system and adapt the control programs and the functions of your machine.

Planning, conversion and commissioning from a single provider.
Send a no-obligation inquiry and discuss technical details directly
A retrofit is worth considering when the mechanical parts are still sound but the control system is outdated.
We review the controller, software and peripherals using the available documentation. Together, we determine which components can be reused and where replacement is necessary.

PLC control system modernisation
We assess the existing PLC, switch to your preferred control system and adapt the control programs and the functions of your machine.

WinCC, operator screens and interfaces
We update the existing operator screens, messages and communication interfaces for drives, peripherals and higher-level systems.

EPLAN and cabinet modifications
We assess the electrical installation and plan cabinet modifications. Wiring and components may be retained where suitable.

Functional checks and commissioning
We test machine functions and interfaces, commission the modified control system and document current software versions.

Reference project
We replaced the S7-300 with an S7-1500 and updated the visualisation and warehouse management software.
Review hardware, program versions, interfaces and documentation. Define the required functions and clarify outstanding questions at the machine.
Plan the hardware, software and control cabinet modifications. Agree the sequence of work, functional checks and how production will restart.
Carry out the conversion during the agreed production shutdown. Check signals, machine functions and interfaces before restarting the machine.
Hand over software versions and documentation. Agree any further support on site or through documented remote access.
An estimate needs a defined scope and an understanding of the existing installation.
Costs depend on factors such as:
Practical questions
That depends on the controller currently in use and its planned replacement. Parts of the program can often be reused; others need to be adapted or rewritten for the new controller.
A retrofit may still be possible. Missing circuit diagrams can be reconstructed from the wiring. If no usable program is available, the machine's operating sequence needs to be recorded as the basis for a new program.
Yes, if they are in working order and compatible with the new controller. This depends on their connections and how they exchange signals and data.
The duration depends on the conversion work and the checks that follow. We complete planning and programming before the shutdown where possible. We agree the time needed for work on the machine with your production team.
You receive the current program versions and the agreed documentation. If questions, faults or further changes arise later, we can provide on-site or remote support by arrangement.
A short description is enough to start. Feel free to contact us even if documents are missing.