We overhaul your stacker's controls and drives, update the operator interface and fault messages, and integrate adjacent conveyor systems.

When the control system becomes a bottleneck

PLC retrofit for existing machines

Spare parts are difficult to obtain. Recurring faults and time-consuming troubleshooting extend downtime.

Cumbersome operation and new requirements for sequences or conveyors are good reasons for a retrofit. We assess which functions need adapting and which components of your existing stacker can remain in use.

Services for your timber stacker

Wiring and terminals inside an industrial control cabinet

PLC controls & software

Controller migration and machine sequences

Migrate controls to current hardware. Adapt sequence logic and interfaces to the functions and requirements of your timber stacker.

CNC machine with an operator display

Operation & diagnostics

Operator screens, messages and modes

Update operator screens and operating modes. Clear fault messages support troubleshooting and day-to-day operation of your stacker.

Industrial Ethernet switch with network cables

Drives & integration

Positioning, sensors and conveyor systems

Match drives and sensors to the stacking sequence. Integrate conveyors, sorting systems and downstream machines via interfaces.

Electrical circuit drawing with tools

Control cabinets & electrical systems

Electrical design and cabinet modifications

Plan electrical changes and replace components. Modify the control cabinet and update drawings and documentation to reflect the installation.

Automated small-parts warehouse with its existing storage machinery

Reference project

Control-system retrofit for a small-parts warehouse

We replaced the S7-300 with an S7-1500 and updated the visualisation and warehouse management software.

Previous controller
SIMATIC S7-300
New controller
SIMATIC S7-1500
Retained
Existing warehouse machinery
View the warehouse retrofit (in German)

From assessment to restart

  1. Assess the installation

    Review hardware, software, drawings and interfaces with production and maintenance. Define the required functions and clarify missing information at the machine.

  2. Prepare the conversion

    Define the control design and components. Prepare software, electrical drawings and cabinet work. Agree preliminary tests, the shutdown window and restart criteria.

  3. Convert and commission

    Carry out the conversion during the agreed shutdown. Check signals, operating modes, stacking sequences and connected conveyors before restarting.

  4. Hand over and support

    Train operators on functions and diagnostics. Hand over current software versions and documentation, and agree further on-site or remote support.

What determines retrofit costs

An estimate needs a defined scope and an understanding of the existing installation.

Costs depend on factors such as:

  • Number of controllers, I/O and connected systems
  • Available program versions and documentation
  • Changes to visualisation, interfaces and wiring
  • Testing requirements and available shutdown window

Practical questions

Frequently asked questions about modernisation

Can the existing mechanical components be reused?

Yes, where their condition and the required functions allow it. We assess the mechanical components and their interaction with drives and controls before defining the retrofit scope.

Which documents do you need for the assessment?

Helpful documents include electrical drawings, PLC and HMI projects, hardware lists and drive documentation. Photos, the manufacturer and model, a description of the fault and production requirements also help. Missing documents can be clarified during the assessment.

Is a retrofit possible without the existing PLC program?

It may be possible. The machine's sequences, signals and operating modes must then be recorded as the basis for new software. We assess access to the machine and the additional work before proposing a scope.

How is the production shutdown planned?

We coordinate the work, functional tests and restart with your production team. Planning, programming and preparatory work take place before the shutdown where possible. The required window depends on the installation and agreed scope.

Can adjacent conveyors be integrated?

Yes. We review their controllers, interfaces and signal exchange, then coordinate transfers and operating sequences with the stacker. Required changes are included in the agreed scope.

How do commissioning and on-site support work?

We commission the modified controls at the installation, test the agreed functions and train operators. Further visits or support through an agreed remote connection are arranged to suit the project.

Tell us about your machine

A short description is enough to start. Feel free to contact us even if documents are missing.

Brida Technik GmbH

Niedergams 39, 8524 Deutschlandsberg

Availability: Mon–Fri 08:00–17:00

Send a message