Migrate Siemens PLCs and operator panels. Adapt conveyor sequences and display zone occupancy, operating modes and fault messages clearly for maintenance.

Retrofits for conveyor systems
We upgrade controls, drives and operator panels. Careful preparation keeps downtime short.
PLC spares are hard to source. The conveyor has stopped, but the operator panel gives no clear fault message.
A new palletiser or warehouse connection can also require different sequences and interfaces. We assess how your existing conveyor line can be adapted to the new requirements.

Siemens migration and fault diagnosis
Migrate Siemens PLCs and operator panels. Adapt conveyor sequences and display zone occupancy, operating modes and fault messages clearly for maintenance.

Roller conveyors, chains and transfers
Update drives on roller and chain conveyors. Check pallet detection, stopping positions and sensors at transfer points against the required movement sequence.

Palletisers, lifts and warehouse systems
Coordinate transfers between conveyor zones, palletisers, lifts and warehouse systems. Define the signals for readiness, occupancy, transfer permission and faults at each interface.

Electrical drawings and cabinet work
Plan the electrical changes and cabinet modifications. Replace the agreed components, adapt wiring and update drawings to match the converted conveyor line.

Reference project
We replaced the S7-300 with an S7-1500 and updated the visualisation and warehouse management software.
The project involved an automated small-parts warehouse. Its existing machinery remained in use after the Siemens PLC migration.
View the warehouse retrofit (in German)We agree the shutdown window and restart checks with your production and maintenance teams. The plan follows the pallet route through the line, including stops, transfers and connections to neighbouring equipment.
Review PLC and HMI backups, drive settings and electrical drawings. Trace the pallet route, zone occupancy and interface signals on the line. Record missing information and the operating sequences that must be retained.
Define hardware, software and cabinet work. Agree the shutdown window, test pallets and restart criteria. Prepare software and drawings, carry out available preliminary tests and coordinate work with adjacent equipment.
Complete the conversion during the agreed shutdown. Check signals, drives and operating modes, then test every zone and handoff with pallets. Check fault messages and recovery before the agreed production restart.
Record the test results and train operators and maintenance staff on the changed functions and diagnostics. Hand over current software, drive settings and drawings. Agree support for the initial production run and subsequent operation.
An estimate needs a defined scope and a clear picture of the existing conveyor line.
Costs depend on factors such as:
Practical questions
Yes, where their condition and the required functions allow it. We assess the mechanics, motors, sensors and wiring, then check compatibility with the proposed controls and drives. The replacement scope is agreed before conversion.
Start with the information you have. We check which programs and settings can be retrieved and which signals and sequences need recording on the line. Missing information affects the assessment work and is included in the proposed scope.
We review the existing hardware, software, I/O, drives and interfaces together with the required functions. The target PLC and operator panel are selected to suit the line. Any changes to programs, communications and wiring are included in the plan.
That depends on the agreed modifications and test scope. Planning, programming and preparation take place before shutdown where possible. We agree a window with production and include time to check each zone, handoff and restart sequence.
We review the interface with the equipment supplier and agree the required signals and data. Readiness, zone occupancy, transfer permission and fault handling must work across the connection. The handoff is tested with the connected equipment before restart.
The agreed diagnostics show the affected zone and relevant fault or missing permission. During commissioning, we test representative fault situations and recovery with your team. Maintenance receives the current documentation, and further on-site or remote support can be arranged.
A short description is enough to start. Tell us the site location, the PLC or HMI model if known, and what prompted your enquiry.